We knew the forecast for Tuesday was rain. But, the day started out OK- cold and overcast with no rain. We had all women on site and Victor. Today was the day to begin lifting roof trusses into place and we were pretty excited. Jennifer, the homeowner was working on site today and that added extra emotion to the day.
We began with the end gable truss that need to be set up on top of the interior walls. The open living room and kitchen area provided the perfect place to maneuver the truss. In by way of the front door worked perfectly. Then the truss was lifted to lay across the interior walls so we could sheet it with OSB and add the gable overhang. This kept the weight that needed to be lifted manageable.
Things were really beginning to click. Every one had a good feel for the system of lifting and we were anxious to see the first truss go up. Mother Nature however had a different plan. About 2 hours into working we were all set to lift the gable truss and nail it to the braces. It began to really rain which wasn't a deal breaker but the winds kicked up and almost blew over the people on top of the truss. Vic and I looked at each other and said "Let's wrap it up" .
Safety has to be the number one priority as we work this project. I understand that Saturday May 15th is supposed to be great weather and we could really use a solid work day. I'm very anxious to get the house closed up with roof and windows.
No comments:
Post a Comment